Topic 2: Rail Transit Infrastructure Development &Construction |
| Commissioning Award-winning Architecture for the Circle Line Andrew Mead |
| In-house Combined Services Drawing / Structural, Electrical & Mechanical (CSD/SEM) Coordination and Drawing Production for Downtown Line 1 (DTL1) Promenade Station and Tunnels Raymond Liw Chee Wei, Eric Chua and Michael Chou |
| Design and Construction of Circle Line Telok Blangah Station Ng Choon Yeang, Chepurthy Veeresh and Rama Venkta |
| Trackside Auxiliaries - The Pros and Cons of System-wide Approach and Section Approach Charlie Cheng, Emil Cheung, Chris Chan, Ang Kok Wee and Melvyn Thong |
Topic 3: Rail Transit Systems & Technology |
| Water Mist Fire Extinguishing System for Underground Transformer Rooms for Singapore Rapid Transit System James Hui, Dicken Wu, Tony Chiu, Melvyn Thong, Kwee Chew Lim and Boon Tong Tan |
| Interfaces within the Rolling Stock System Chia Choon Poh, Wong Chin Sim Vincent and Xun Haitao |
| Challenges Faced in Managing Signalling Project for Singapore Circle Line Kok Yen Hui, Lee Beng Hooi, Timothy Toh and Tan Kian Tong |
| Considerations in the Earthing Design of Power Socket Outlets in DC Electrified Rail Transit Tunnels Chris Chan, Regina Yip, Matthew Ngan, Melvyn Thong, Malvin Ho and Kok Beng Yeo |
| Study of the Determinants of Complexity of Railway Operation Leaw Pui Sim, Chia Choon Poh and Joseph Tan |
| Challenges Faced in Platform Screen Doors Construction for Singapore Circle Line Project Woo Handa Raymond, Lim Li Ting, Chan Chee Gid Paul and Kok Yen Hui |
| Dissipation Array System (DAS) Daiju Nakamura |
| Selection of Trackform for Downtown Line 1&2 Ong Phui Kai and Sim Siang Boon |
Topic 6: Rail Transit Operation & Maintenance |
| Case Studies of Traction Power Outages Due to Excessive Rail to Earth Potential Rise Foo Jang Kae |
| Aspects of Upgrading/Replacement Works for the Power Supply System Equipment in the Existing RTS of Singapore Yeo Kok Beng, Chia Song Khoon, Melvyn Thong and Adrian Cheong |
| Management and Maintenance of Slopes Along Existing Rapid Transit System Gan Chan Chuin and Wen Dazhi |
| Challenges in Maintaining a Fully Integrated and Software Driven Metro: Case Study of North East Line, Singapore Lee Yam Lim, Leong Yim Sing and Wong Wai Keong |